Integrating design and production system for the precast industry

Hdl Handle:
http://hdl.handle.net/10149/98184
Title:
Integrating design and production system for the precast industry
Other Titles:
Integration von Planung und Produktion in der Vorfertigung
Authors:
Dawood, N. N. (Nashwan)
Affiliation:
University of Teesside. School of Science and Technology.
Citation:
Dawood, N. N. (1999) 'Integrating design and production system for the precast industry', Betonwerk und Fertigteil-Technik/Concrete Precasting Plant and Technology
Publisher:
Bauverlag BV GmbH
Journal:
Betonwerk und Fertigteil-Technik/Concrete Precasting Plant and Technology
Issue Date:
1999
URI:
http://hdl.handle.net/10149/98184
Abstract:
The UK construction industry is going through a major re-appraisal with the objective of reducing construction cost by at least 30% by the end of this millennium. Prefabrication and off-site construction are set to play a major role in improving construction productivity, reducing cost and improving working conditions.
Type:
Article
Language:
en
Keywords:
construction industry; prefabrication; off-site construction; productivity; industrial economics
ISSN:
0373-4331
Rights:
No publisher policy information on http://www.sherpa.ac.uk/romeo/ [Accessed/07/05/2010]
Citation Count:
0 [Scopus, 07/05/2010]

Full metadata record

DC FieldValue Language
dc.contributor.authorDawood, N. N. (Nashwan)en
dc.date.accessioned2010-05-07T13:16:45Z-
dc.date.available2010-05-07T13:16:45Z-
dc.date.issued1999-
dc.identifier.citationBetonwerk und Fertigteil-Technik/Concrete Precasting Plant and Technology; 65(5):74-80en
dc.identifier.issn0373-4331-
dc.identifier.urihttp://hdl.handle.net/10149/98184-
dc.description.abstractThe UK construction industry is going through a major re-appraisal with the objective of reducing construction cost by at least 30% by the end of this millennium. Prefabrication and off-site construction are set to play a major role in improving construction productivity, reducing cost and improving working conditions.en
dc.language.isoenen
dc.publisherBauverlag BV GmbHen
dc.rightsNo publisher policy information on http://www.sherpa.ac.uk/romeo/ [Accessed/07/05/2010]en
dc.subjectconstruction industryen
dc.subjectprefabricationen
dc.subjectoff-site constructionen
dc.subjectproductivityen
dc.subjectindustrial economicsen
dc.titleIntegrating design and production system for the precast industryen
dc.title.alternativeIntegration von Planung und Produktion in der Vorfertigungen
dc.typeArticleen
dc.contributor.departmentUniversity of Teesside. School of Science and Technology.en
dc.identifier.journalBetonwerk und Fertigteil-Technik/Concrete Precasting Plant and Technologyen
ref.citationcount0 [Scopus, 07/05/2010]en
or.citation.harvardDawood, N. N. (1999) 'Integrating design and production system for the precast industry', Betonwerk und Fertigteil-Technik/Concrete Precasting Plant and Technology-
All Items in TeesRep are protected by copyright, with all rights reserved, unless otherwise indicated.